Construction date: August 16, 2015
Mixer model: JS1500 concrete mixer
Theoretical productivity: 90 m³/h
Application: Hydro-power infrastructure
The Tibet Branch of the Sinohydro Foundation Engineering Co., Ltd has a water supply project with a construction period of 365 days in the county town of Zanda County in the Ali area.
Camelway HZS90 concrete batching plant is installed near the construction site. Two concrete mixer trucks help them transport concrete to the construction site in a timely and efficient manner.
- Continent Asia
- Location Tibet
- Company PowerChina
- Product HZS90 Concrete Plant