Concrete Batching Plant Installation Time

Ivy 2019-06-03 11:02

Concrete Batching Plant Installation Time

The concrete batching plant is an indispensable equipment in infrastructure construction. The following introduces how long it takes to build a concrete batching plant.

First of all, different models of concrete batching plant has different installation time. Camelway concrete plant models are from HZS25 to 2HZS240. Their theoretical productivity from 25 m³/h of  to 480 m³/h. As you know, the larger theoretical productivity takes longer installation time.

concrete batching plant type

The small concrete plant, for example, HZS25 and HZS35, has compact structure and modular design. It can be installed successfully within 3 or 4 days. It takes at least 7 days for the HZS50 concrete plant, the HZS60 concrete plant and the HZS75 concrete plant to be installed. Other large-scale concrete plant, such as hzs120, hzs180, they need 20 to 30 days to complete the installation.

The concrete plant needs to be installed under the guidance of professional technicians, laying a foundation for future safe production. It will facilitate the continuous production of concrete to bring considerable benefits to customers. In addition, the installation time mentioned above does not include the time for laying foundation. The foundation of concrete plant is usually laid before the company dispatches the installer.

Concrete Batching Plant Installation Time

Request a Quote

*

*

*

Include a self introduction and special requests(if any) for better quotations.

Related Proudcts

Latest News