Tibet Hydropower Infrastructure Construction

Ivy 2015-08-16 09:35

Construction date: August 16, 2015
Mixer model: JS1500 concrete mixer
Theoretical productivity: 90 m³/h
Application: Hydro-power infrastructure

The Tibet Branch of the Sinohydro Foundation Engineering Co., Ltd has a water supply project with a construction period of 365 days in the county town of Zanda County in the Ali area.

Camelway HZS90 concrete batching plant is installed near the construction site. Two concrete mixer trucks help them transport concrete to the construction site in a timely and efficient manner.

Customer Reviews
“We have been working with Camelway Machinery for 8 years. During this period, we have cooperated with many projects, such as bridges, road construction, water plants and dam construction. We believe this manufacturer. The new twin-shaft concrete mixer is more efficient and lower power consumption. We are satisfied with this.” Mr. Liu said.

Concrete Batching Planthzs90 concrete batching plantconcrete plant for hydropower project