China Railway 15th Railway Project

Ivy 2015-02-23 10:18

Construction date: February 23, 2015
Location: From Datong to Xi'an
Theoretical productivity: 120 m³/ h
Application: Railway construction

As a national project, China Railway 15th Bureau has extremely strict requirements on quality. The equipment must comply with the environmental standards and run stably with high output, ensuring the smooth progress of the project.
After inspecting domestic manufacturers, they chose to purchase Camelway two HZS120 concrete plants. Because Camelway concrete plant gets the advantages of stable operation, energy saving and environmental protection, ect.